Prerequisite Tree
Prerequisite Tree
Purpose
Order the conditions that must exist before the group responsibly scales or replicates the proposed operating system.
Entities
| Obstacle | Intermediate objective |
|---|---|
| OBS-1 β Goal, UDEs, and arrows are not validated | IO-1 β Stewarded model accepted for provisional use |
| OBS-2 β Throughput may be contested or reductive | IO-2 β Mixed-method throughput protocol accepted |
| OBS-3 β People lack a next step and may resist funneling | IO-3 β Transparent consent-based entry pathway exists |
| OBS-4 β Intellectual agreement does not change practice | IO-4 β Recurring progressive practice exists |
| OBS-5 β Delegation risks quality or status hierarchy | IO-5 β Accountable graduated stewardship exists |
| OBS-6 β Values are hard to sustain without containers | IO-6 β Outward-facing pilot pocket/sangha operates |
| OBS-7 β Practices remain tacit or spread shallowly | IO-7 β Maturity-rated adaptable library exists |
Logical connections
OBS-1 is overcome by IO-1
IO-1 enables IO-2
OBS-2 is overcome by IO-2
IO-2 enables IO-3
OBS-3 is overcome by IO-3
IO-3 enables IO-4
OBS-4 is overcome by IO-4
IO-4 enables IO-5
OBS-5 is overcome by IO-5
IO-5 enables IO-6
OBS-6 is overcome by IO-6
IO-6 enables IO-7
OBS-7 is overcome by IO-7
IO-7 enables INJ-1
This chain is a priority spine, not a claim that later learning must wait entirely for earlier work. Small downstream probes may run when they do not pre-empt the governance and evidence questions.
Evidence
EVD-11βEVD-18. The supplied PRT explicitly starts its key chain with update governance and provisional validation.
Assumptions
- A model that lacks standing cannot safely define group throughput.
- A throughput definition is needed to evaluate entry experiments.
- Real entry observations are needed before investing in full practice architecture.
- Practice evidence is needed before formalizing stewardship and replication.
Confidence
High that IO-1 is the earliest prerequisite in the source; medium for the strict order of all later objectives.
Open reservations
- Some work can be concurrent: safeguarding and facilitator standards may need to start before any practice pilot.
- Funding or ownership could precede every modeled objective.
- The group may already satisfy parts of the chain; no state evidence was supplied.
Diagram
flowchart TB
O1["OBS-1 Unvalidated model"] --> I1["IO-1 Provisional shared model"]
I1 --> I2["IO-2 Throughput protocol"]
O2["OBS-2 Contest/reduction risk"] --> I2
I2 --> I3["IO-3 Consent-based entry"]
O3["OBS-3 No next step"] --> I3
I3 --> I4["IO-4 Recurring practice"]
O4["OBS-4 Knowledge-action gap"] --> I4
I4 --> I5["IO-5 Graduated stewardship"]
O5["OBS-5 Quality/status risk"] --> I5
I5 --> I6["IO-6 Pilot pocket/sangha"]
O6["OBS-6 Weak containers"] --> I6
I6 --> I7["IO-7 Replication library"]
O7["OBS-7 Tacit/shallow copying"] --> I7
I7 --> INJ1["INJ-1 Scale through depth"]
Cross-tree references
Each IO enables an injection or desired effect in the FRT. ACT-1βACT-4 operationalize IO-1βIO-4.